Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance of the existing access roads along a…
This Categorical Exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from approximate…
Subcontractor shall provide required security, safety, administrative, managerial, operational, and logistical services for the SPR from 2019-2024.…
The proposed action decontaminates six experiment loop piping systems and the canal recycle system of the Advanced Test Reactor, TRA-670. The loop …
Well management activities include decommissioning (abandonment) of inactive wells and injection wells at the Idaho National Laboratory Site. The w…
The Bonneville Power Administration is proposing to remedy three impairments along the Potholes-Grand Coulee No. 1 Transmission Line within Bonnevi…
Bonneville Power Administration has identified a transmission line clearance impairment on the Cascade Steel Tap to Carlton-Sherwood #1 transmissio…
Remove and re-install insulation housing from secondary chill water pump 006 at Building 785-6A. The asbestos inspection report found insulation to…
Excavate and repair underground Service Water link near Building 784-A. Leak is due to normal wear and tear. Replacement materials will be like-for…