Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its tandem Alcova-Ca…
Remove and replace floor material and ceiling tile in specific rooms in 701-1L.…
Replace damaged and loose carpet with carpet squares to match carpet previously replaced in other areas of the building on all three floors.…
Re-Insulate 931- condensate tank and associated piping.…
Replace carpet in IT Area in 730-4B 1st Floor.…
Install VTC in room 344 of 730-1B.…
Install WI-FI in 730-2B Room 204.…
Replace steps and decking at 235-11F.…
Install a 250V, 20A, NEMA 6-20R receptacle with cover plates in room 126 of 773-52A.…
Install additional 120V receptacles in Rooms 106, 107, and 185 of Building 703-47A.…