This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket materials.…
Subcontractor will provide roof replacement at Building 701-2L.…
Bonneville Power Administration (BPA) proposes to repair or improve approximately 18.25 miles and construct approximately 600 linear feet of access…
Pump Corrshield MD4100 into Chilled Water Loop at 789-2B.…
Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms…
The scope of the Radioactive Materials Laboratory (RML) Ventilation System Replacement Project is to replace all the filter housings and ductwork curr
The Bonneville Power Administration (BPA) proposes to replace 2 wood pole transmission structures along the South Tacoma-Southwest No. 1 230-kV tra…