Services of Subcontractor to provide all tools, equipment, transportation, labor, supervision, and services required to perform the work in connect…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 11/6, 20/7, and 23/6 on its Alcova-M…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structure 40/5 on its Gore Pass-Hayden (GOT-HDN)…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing structure 15/7, on its Boyd-Airport (BYD-ARP) 11…
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
This proposed activity will renovate men's and women's bathrooms on the fourth level of H Canyon.…
Dispose of HEPA/Pre-filters to N-Area form IH Hood used to analyze potential asbestos samples.…
This proposed activity will remove roofing on top of H Canyon and install a water-proofing system.…
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…