Apply water-proof coating and sealant to newly installed plywood on top of cell No. 4 on 785-2A, Cooling Tower 2.…
Replace existing propane monitors at Building 754-11A.…
Repair cracking, spalling, detaching of concrete along expansion joints and construction joints of the 221-H concrete exterior walls.…
Replace floor tile in building 713-1N, Section A1, Corridor No. 2 hallway between offices N321 and N204.…
Roofing rework at 105-13K.…
766-H Repair sheetrock, install missing cove base.…
Proposed activity is to dig beside the 285-H basin wall at the construction joint that is leaking and complete repair.…
Repair and replace failed septic system at 709-7G.…
Replace front entrance door and frame at 705-C.…
Install a hands free water dispenser in the lobby of 730-2B.…