Repair and Replace Packing of 1 Steam Valve Outside of K-Area Purification and 2 Steam Valve Inside of Purification…
Make repairs to floor of 704-37E and 704-29E.…
The subcontractor shall replace wooden line switch ties from the railroad bed, identified by site transportation and engineering as part of the 202…
Perform structural repairs on 772-F and 772-1F per the structural integrity program, SIP, inspection report T-CLC-F-00557.…
Install Universal Wiring, UW, drops in Building 730-2B.…
A vendor will generate and or remove excess wastewater from various systems and containments located across SRS.…
The 233-24H warehouse building heat pump is being replaced and utilizes slightly different controls.…
Subcontractor will provide roof repairs at 706-6F.…
Subcontractor will provide roof repairs at 713-3N.…
Subcontractor will provide roof repairs at 703-B.…