DOE LM is proposing to install aerial survey monuments at the Rifle disposal site.…
BPA is proposing to perform routine road maintenance to approximately 2.69 linear miles of existing access road for the Grand Coulee – Chief Joseph…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containing mater…
Bonneville Power Administration (BPA) proposes to perform routine road maintenance, repair, and improvements on approximately 1,650 linear feet of …
Remove and install cove base in main corridors and foyers with same color/style. Prep and paint Room 125.…
Remove west filter hold-down beam from 55 Elevation of the 105-L Building.…
Repair water damage in Building 705-N, Room 6.…
Remove and replace 931 condensate tank Pump A in -40 of 105-L.…
Seal K-Area sealand/seatrain roof with Blue Max sealant to prevent leakage.…
Existing high pressure sodium light fixtures in 233-H attic will be replaced with LED fixtures.…