Paint walls/door, replace floor tile, and ceiling tiles in Building 704-K Room 161 and prep/paint 704-K lunch room walls, doors, and replace ceilin…
The DCF will update a TCVG indicator from an obsolete model number to a new model supported by the vendor (Teledyne Hastings Instruments). The pre…
Remove, replace, reinstall HPC-TRP-002 (steam trap) associated piping, insulation (non-asbestos). There is an associated presumed asbestos contain…
Paint the wall as you turn right off the elevator on the 2nd floor from corner to corner. The paint should match the color that is currently on the…
Removal of suspect asbestos gaskets from valves in Building 703-A to facilate replacement of relief valves, steam traps, and/or other valves associ…
Remove and replace carpet in rooms 569, 570, 567, 566, 565, 564, 563, 562, 598, 597, 596, & 572. Rooms 596, 597, & 598 will have asbestos tile to …
Sealant to be applied on K-Area Disassembly Basin roof to prevent inleakage, as well as general housekeeping on K-Disassembly Basin roof.…
DOE LM is proposing to install aerial survey monuments at the Ambrosia Lake disposal site. Aerial survey quality control monuments would be constru…
DOE-SR owns a 115-kV electricity transmission grid that provides electrical power to facilities sitewide. The infrastructure and vegetation on the…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to relocate existing Structure 22/16 on its Guernsey Rural-Wheatlan…