Southwestern Power Administration proposes to modify existing ground grid, add additional stone to substation paving, provide drainage improvements…
This scope of work is to remove any existing material from the three specified expansion joints—one of which lacks any sealant and is cracking—and …
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is not required. These exca…
Removal of two 1/2"-asbestos gaskets from an Inlet Sample Valve on the Purge Water Tank # 1 in M-Area (M-782002) and replace with asbestos gaskets.…
Repairs are needed for a damaged wall in room 1056 at 766-H.…
The National Air Duct Cleaning Association ( NADCA ) contractor shall provide all material, tools, consumables, equipment, supplies, transportation…
The subcontractors shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Curecanti-Poncha…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its North GunnisonSa…
The Bonneville Power Administration (BPA) is proposing to replace cross-arms on 13 wood pole structures along the Grand Coulee-Okanagan No. 2 trans…