Housekeeping the 105-C Stack Area.…
Installation of flow restricting orifices on flammable gas cylinder installations throughout 773-A Section C.…
This DCF provides the design for the following functions: (1) Isolating Mass Spec 20 from Mass Spec 22 by blanking the interconnect manifold to all…
Janitor's closet enhancements to be done in 704-K.…
Subcontractor will provide roof repairs at 770-A with addition of Hydro-Stop coating.…
Western Area Power Administration (WAPA) proposes to conduct “danger tree” management along its Flatiron-Pole Hill (F-PH) 115-kV, and Estes-Pole Hi…
MSA/HMIS to perform routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (including, but…
703-43A Remove/replace carpet.…
730-4B Touch up paint and replace cove base for Rooms 135A, 135B, and 134.…
The Kesselring Site Head Tanks Corrosion Protection Project includes work to Head Tanks (27A and 27B) for repairs to the interior iron oxide uretha…