CX-022993: Isolation of Mass Spec 20 from Mass Spec 22 and Relocation of Leak 52 to Mass Spec 20

This DCF provides the design for the following functions: (1) Isolating Mass Spec 20 from Mass Spec 22 by blanking the interconnect manifold to all…

Office of NEPA Policy and Compliance

December 16, 2020
minute read time

This DCF provides the design for the following functions: (1) Isolating Mass Spec 20 from Mass Spec 22 by blanking the interconnect manifold to allow Mass Spec 20 to operate as a stand alone system, (2) Removing leak valve 52 from Manifold 2 of Mass Spec 22, (3) Relocating leak valve 52 to an open location on Mass Spec 20, and (4) Removing remaining capillary leaks, capping/plugging their manifold positions, and capping the instrument air lines.