Replace well water valve WW-V-074 at 285-H.…
782-2G Correct and replace domestic water pressure regulator valve to E-Area PCV-002.…
Excavate and replace Post Indicator Valve (PIV) 2021 West of Building 704-N.…
Subcontractor will provide roof repairs at Building 717-N. The Subcontractor will disturb the existing roof while performing these repairs on Build…
Painting and door replacement activities associated with Building 704-1N.…
Excavation activities to upgrade the H-Area trailer city parking lot with addition to the parking area.…
902-3H Replace packing in valve H2-902-3-FP-V-022.…
Subcontractor will provide roof repairs at Building 773-A, F-wing.…
Replace bearings for on chilled water pump at 235-2F. The presumed asbestos containing material (PACM) gasket material at the flanges will be remov…
Remove one Presumed Asbestos Containing Material (PACM) gasket from ABRP well AHT-14. Removal of gasket will allow for maintenance to repair broke…