Remove lead acid batteries from 3 installed UPS systems battery cabinets and disposition battery cabinets as scrap metal.…
Replace the airtrol tank fittings on the furnace 1 and 2 cooling water expansion tanks with a designed fitting using swagelok parts.…
Install a blank on Duct 7902 in 233-H Room 10 supply register.…
BPA proposes to remedy three impairments along the Grand Ronde-Boyer transmission line located in Polk County, Oregon, within BPA's Salem District.…
Install an automatic transfer switch (ATS) to provide two different sources of electrical power to lighting panel PNL PP1 in Building 703-44A.…
Run new conduit and conductors from disconnect.…
233-H Tritium Air Monitoring Sample Point valve K-51 M-R1 will be removed and blank pipe flange installed.…
The HANM Classified D/3 DCS 16000 I/O modules in PCM-13 that interface with field instruments and controls have exceeded end of life.…
Maintenance of Li-COR 7500 Infrared Gas Analyzers used to monitor Carbon Dioxide concentrations at two meteorological towers, one located onsite at…
The proposed activity involves reconfiguring copper lines, removal and disposal of an accordion curtain, the removal and disposal of a non-rad glov…