Office work
BPA proposes to replace the existing 2.5-inch expanded line conductor on the John Day Powerhouse-John Day No. 1 through 4 transmission lines from s…
Removal of water, soil, and gravel will be required along with necessary repairs to prevent future wash-outs.…
782-3A Restroom floor repair.…
Extend breakroom on south side of Bldg. 717-8N.
704-1N carpet replacement.…
The EEC covers the renovations for the interior of building 713-1N.…
Glen Canyon-Navajo 230-kV Transmission Line Structure Footer Maintenance…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance to one structure on its Hesperus-Wat…
This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS.…