Install a Shoreline Power drop in Building 709-7G for the reserve fire truck.…
The Bonneville Power Administration (BPA) proposes to correct two areas along the St. Clair-South Tacoma transmission line where the ground to cond…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G). …
Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…
Crush and run will be applied to level the access path to Sampling Point PB-3 off of Highway 125.…
Subcontractor will provide roof repairs at 617-11G. The Subcontractor will disturb the existing roof while performing these repairs on 617-11G. The…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
Valve and presumed asbestos containing material (PACM) gasket removal and replacement at H Base Injection.…