Remove two presumed asbestos containing material (PACM) gaskets from Recovery Well 8 to allow for routine maintenance.…
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
This proposed activity will regasket a drop jumper in the Canyon Building. The gasket is assumed to be asbestos containing material.…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …
Reroute Domestic Water underground piping around Trailers 704-62S and 704-63S.…