In 108-1L, remove existing instrument air piping valves V-563, V-564, and V-565. Fabricate, hydro test, in-service leak test & install new spool p…
Subcontractor will provide roof repairs at Building 246-2H. The Subcontractor will disturb the existing roof while performing these repairs.…
Replace Valves V-36, V-152, V-87 and V-406 on Steam System. Valves V-36, V-87, and V-406 will also include replacement of presumed asbestos contai…
The existing B4 lower roof will be removed and replaced with a new bitumen roofing system. The EIFS will be repaired, resurfaced, and repainted. Ha…
Replace PRV FP-PRV-003 at the Fire Water Pump House Building 902-3H. Valve is leaking and needs to be replaced. Valve is being replaced due to nor…
The proposed project would provide greater resiliency at the data centers in Building 12-37. The electrical system would be split into two separat…
Repair insulation at steam stations and piping in Building 772-F & 772-1F Court Yard.…
Replace the two leaking roof drains on Building 234-H and 4" roof drain piping as applicable.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Construction will remove asbestos insulation and replace with non-asbestos insulation.…