Several offices and spaces will be remodeled to move people from B2 and B3.…
Western Area Power Administration (WAPA), Rocky Mountain Region, proposes to conduct routine herbicide application for vegetation management at the…
The Building 250-S roof is to be replaced.…
Replace the packing in Return Pump #3 at 281-2H.…
Augusta Industrial to pressure wash internal cooling tower basins at 785-1B and 785-A.…
Room 169 is being modified to accommodate office spaces throughout the room, resulting in deficient notification device coverage as required byNFPA…
Install backboards in phone room in 722-A.…
Subcontractor will provide roof repairs at 704-16B.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Casper-Glendo No…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…