Demo/removal of the windows/panels on the east wall of Building 83 at the NETL Pittsburgh Site and the replacement of these windows/panels with a c…
The most schedule and cost effective solution for INL's future mission is to convert operation and management of existing telecommunication transpo…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
BPA proposes to remove a tree that has fallen on the 13.8-kilovolt double-circuit Big Cliff-Detroit PH 1-2 No. 1 and No. 2 transmission lines betwe…
BPA proposes to replace 12 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.…
This ECP covers the Laboratory Directed Research and Development (LDRD) project which started in FY-18 and will continue into FY-21.…
709-1G, Replace damaged tile and wallboard in ladies shower.…
Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch exist…
Bonneville Power Administration (BPA) proposes to fund operations and maintenance (O and M) on lands owned and managed by the Kalispel Tribe in Was…
Pennsylvania State University proposes to study fundamental characteristics of molten fluoride salts in order to develop a thermodynamic model of t…