Remove suspect asbestos gaskets on discharge line at 905-103F.…
Replace existing sidewalk on the north side of Buildings 7-11.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing wooden H-frame structures along its Box Butte S…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance of the existing access roads along a…
This Categorical Exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from approximate…
Subcontractor shall provide required security, safety, administrative, managerial, operational, and logistical services for the SPR from 2019-2024.…
The proposed action decontaminates six experiment loop piping systems and the canal recycle system of the Advanced Test Reactor, TRA-670. The loop …
Well management activities include decommissioning (abandonment) of inactive wells and injection wells at the Idaho National Laboratory Site. The w…
The Bonneville Power Administration is proposing to remedy three impairments along the Potholes-Grand Coulee No. 1 Transmission Line within Bonnevi…