The gaskets between the flanges on the #4 river water pump have to be removed. This will allow construction to bead blast the river water pump. The…
Where reasonable and economically feasible, replace High Intensity Discharge fixtures with light emitting diode equivalents. …
The proposed action will replace a failed culvert that crosses the Argonne National Laboratory fence line, east of Kearney Road. The 30" diameter c…
Replace the failed Automatic Transfer Switch (ATS-03) in Building 105-L. The model is not longer manufactured. Some disassembly and removal of elec…
Excavate and repair underground domestic water leak near Building 292-S.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard. …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install a new gate and posts on Xcel Energy's property north of …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Ault-Craig (AU-C…
The chilled water supply to the breathing air compressor (No. 2) after-cooler/moisture separator has a developed a leak in the ceiling adjacent to …
Replace positive crankcase ventilation 001 outlet isolation valves A1-901-SW-V-428 & A1-901-SW-V-429 at 901-A. Valves are leaking. Gaskets will be…