Bonneville Power Administration has identified a transmission line clearance impairment on the Cascade Steel Tap to Carlton-Sherwood #1 transmissio…
Remove and re-install insulation housing from secondary chill water pump 006 at Building 785-6A. The asbestos inspection report found insulation to…
Excavate and repair underground Service Water link near Building 784-A. Leak is due to normal wear and tear. Replacement materials will be like-for…
Replace packing in Deepwell Pump 905-108H. Treat packing/gaskets as asbesto…
This proposed activity will install a tie-in connection for an alternate diesel generator in the event of extensive repair time for the permanent i…
Paint and seal exterior of Building 722-5A. Scope also includes repairing stucco, installing aluminum plates at foundation, replacement of caulking…
Repair bypass line on Deepwell 905-53A. Pipe is cracked. Welding is required and a weld map is needed. Also repair V-007 broken valve handle.…
Paint and seal exterior of Building 720-2A. Scope also includes repairing stucco, caulking, and prepping the stucco for painting. Paint interior an…
Remove presumed asbestos containing material gaskets and replace PSV-001 on Soda Ash Pump 001 in Building 789-B.…
Remove presumed asbestos containing material gaskets and replace PSV-002 on Soda Ash Pump 002 in Building 789-B.…