Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. The approximate width of the riprap addition i…
772-F domestic water outlet isolation valve is leaking. In order to repair domestic water line near regulator, the presumed asbestos containing mat…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
BPA is proposing to conduct inspection & repair of transmission tower steel lattice legs and concrete footings at transmission structures of the Ch…
Welding repairs on Steam Lines.…
Subcontractor will provide roof repairs to Building 717-2B. The Subcontractor will not disturb the existing roof while performing these repairs on …
BPA proposes to perform routine maintenance along the access roads and structure spur roads of the Paul-Olympia No. 1 transmission line, between st…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…