Inspection and treatment of utility/power poles in the H-Area (Canyon, HTF, General, ETF) and S/Z/J-Areas.…
BPA is proposing to conduct periodic routine maintenance along Tanner Creek Road/USFS Road 777.…
Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms…
To remove the existing slab and installing a new concrete slab in the K9 Kennel Building. Installing a cinderblock wall in the center of the K9 kennel and install fencing around the K9 kennels.
To install a concrete containment slab in the WH drumyard with a curb and drain valves.
Plug and abandon well USBM/AEC CCH-3 and reclaim the site well pad and access road at the Bronco, Colorado, Site…
Construct eleven permanent aerial survey quality control monuments at the Grand Junction, Colorado, Uranium Mill Tailings Radiation Control Act Tit…
BPA proposes to perform an urgent in-kind wood pole replacement on Hawkins -Alvey No.1 structure 5-1.…
BPA proposes to perform repairs to Fairview-Rogue No. 1, Structure 54-2. …
DOE, Office of Legacy Management, proposes to plug and abandon well USBM-AEC CCH No. 3 and reclaim the site well pad and access road at the Bronco,…