This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitors parts in the TritiumExtraction Fac…
Six, 6, new hard wall offices will be constructed on the 2nd floor of Building 730-B.…
Vendor will pressure wash screens for Deepwell 905-108H.…
Install carpet and paint room A129 in 772-F.…
Remove and replace floor tiles in select portions of the Purification Area within the K-Reactor, and prep and paint select wall locations.…
Install additional receptacles in Building 736-A, Room 131.…
Repair and Replace Packing of 1 Steam Valve Outside of K-Area Purification and 2 Steam Valve Inside of Purification…
Make repairs to floor of 704-37E and 704-29E.…
Perform structural repairs on 772-F and 772-1F per the structural integrity program, SIP, inspection report T-CLC-F-00557.…
The subcontractor shall replace wooden line switch ties from the railroad bed, identified by site transportation and engineering as part of the 202…