Repair floors in Trailers 704-37E and 704-29E, including removal and replacement of floor and cove base.…
Valve H2-241125-FP-V-053 (Fire Protection Valve) will be replaced with a like-for-like valve. Valve is leaking. Remove and dispose of asbestos gask…
Remove all coatings down to the original concrete floor in Room 16 of Building 705-N.…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Subcontractor will caulk 30 feet at parapet/expansion joint to stop leaks at Building 284-20H. The Subcontractor will disturb the existing roof…
Savannah River Tritium Enterprise and Savannah River National Laboratory have implemented Digital Imaging and Measurement System, which uses digita…
The north medium bay roll-up door on Building 717-F no longer functions. The north medium bay roll-up door will be replaced, including the door, do…
The men’s rest room has flooded and caused floor damage in Bathroom Trailer 704-73E requiring floor replacement for entire trailer. Construction wi…
The Subcontractor will install one (1) 3" drain insert, flash dry drain insert in with one (1) 4' X 4' modified patch, and seal perimeter of patch…
Clean/vacuum precipitator hopper and extension auger. Wood ash will be delivered to Three Rivers Landfill under a special waste manifest. Rinse wa…