CX-019700: Peacock-Liberty 345-Kilovolt Transmission Line Conductor Wire Repair Near Structure 166-1
Western Area Power Administration Desert Southwest Region proposes to replace broken conductor line wires near structure 166-1 along the Peacock-Li…
Replace the existing stairs, landings, and handrails with aluminum (two each) at Trailer 704-10F. The same size (standard) for both ends as the exi…
Replace service water supply regulator at 785-6A due to normal wear and tear. Replacement will be like for like with no make it fit costs. Gasket m…
The pump packing in Cooling Water Pump 003 at Pump House 681-3G is leaking and needs to be replaced.…
Replace Trailer Space Roll Door Cover, North Side Purification. Door cover may contain asbestos/galbestos material and PCBs.…
H Area Construction Personnel will remove insulation from a steam trap so that leak repairs can be made to the piping.…
The Power Management organization at Idaho National Laboratory needs to perform maintenance and inspection activities on power poles and structures…
Remove and replace water damaged flooring and wall coverings. Repair the north interior door. Seal the roof of the trailer by applying a seal coat.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Hayden-Gore Pass…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct “danger tree” management along its Mary’s Lake-East Port…