Provide approximately 0.6 miles of bituminous surface treatment
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Sterling-Wild…
Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G).…
BPA proposes to replace 15 wood pole structures and associated structural/electrical components along several transmission lines.…
Idaho National Laboratory (INL) has a variety of highways and roads ranging from heavily used, paved State Highways to lightly used, unpaved two-tr…
Subcontractors will repair the roof on Building (Trailer) 221-24H…
Stream surveillance location FM-A7 is part of the routine monthly stream surveillance sampling program on Four Mile creek.…
The focus of the temporary modification is to keep the 232-H backup Exhaust Fan A (53.004-A) available in case of failure of Exhaust Fan B(53.005-A…
On-site testing, inspection, and calibration of the electrical equipment at the main site.…
Paint 12 wellheads at the brine disposal area, and blast and paint the prover piping.…