This EEC covers the design for the relocation of part of the 234-H Finishing Line process to 233-H.…
Prep and paint the 614-24G “C” Area WIND tower, 614-23G “F” Area WIND tower, and 614-22G “H” Area WIND tower.…
Repair and/or replace non-asbestos floor coverings in Building 730-4B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electrical r…
The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Circuit cards that are in need of repair have a conformal coating making it difficult to take measurements to identify non functioning components.…
Humate tanks and associated piping will be flushed with water to remove Potassium Humate (BorreGro HA-1) solids that have settled in the tanks and …
Repair damaged/rotten wood panel in the lead change out area of 711-4N.…
Re-route 772-1F steam condensate discharge.…
Replace floor covering in various non-asbestos rooms/areas in 736-A.…