719-N Prep and Paint 8 Concrete Bollards for High Visibility …
Pull sediment samples from settler tank for characterization and ultimate disposition.…
The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
Replace boiler #3 in B39. Work includes removing existing boiler #3 including disconnecting all electrical and plumbing and installing new boiler i…
DOE LM is proposing to install aerial survey quality control monuments for future aerial survey activities at the Bear Creek, disposal site. Monume…
Remove four truck ramps utilized for KCRIMS transfer, regrade area, expand parking spaces, rework lighting and fire protection lines. September 20…
Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for release of c…
The proposed action would occur in two stages. The first stage would be installation of National Geodetic Survey-style monuments at four proposed l…
The proposed action would occur in two stages. The first stage would be installation of National Geodetic Survey-style monuments at four proposed l…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…