Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
Tile removal and replacement in 105-K Personnel Wing, Room 1013.…
Replace the existing metal halide and fluorescent lights in the K- Area 105-K building with LED Technology.…
Installation of new domestic water piping in J and S-Areas.…
The nature of this modification is to blow out the CW coils in the 234-4H Air Handling Unit (AHU) with air. To do this, each individual coil must b…
Insulation and mastic to be removed from chilled water piping feeding AHU-002 at 702-2A. Section to be removed to allow access to a y-strainer for …
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
The Desert Southwest Region (DSW) routinely operates and maintains more than 243 substations, switch-yards, and communication sites. Routine mainte…