This proposed activity entails having a roofing contractor perform concrete core drilling on the roof of H Canyon.…
Transition the existing Siemens PLC and touchscreen to an Emerson DeltaV controller and touchscreen operator workstation in cabinet H-234000-METL-C…
Correct leak and replace valve SW-V-001(10") at 681-3G Pump House #3.…
Removal and replacement of cracked sidewalks throughout MGN site and sealing of joints on upper level of parking garage. Approximate estimate for c…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed an emergency jumper replacement on Structure 4/2 of the Miracle Mi…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed an emergency relocation of Structure 39/3 on the Flaming Gorge-Ver…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace Structures 2/3 and 2/8 on its Kortes-Miracle Mile (K-MM)…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Estes-Pole Hill …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Estes-Pole Hill (…
Inspection and Treatment of utility/power poles in the H Area (Canyon, HTF, General, ETF) and S/Z/J areas.…