Removal and proper disposal of 2 fume hoods located in Room 112 of building B25. The fume hoods have asbestos containing panels. …
This activity is to evaluate and correct lighting fixtures throughout Building 706-4F.…
Remove all coatings down to the original concrete floor in Room 16 of Bldg. 705-N.…
The Bonneville Power Administration (BPA) proposes to correct two areas along the St. Clair-South Tacoma transmission line where the ground to cond…
Overhaul the diesel driven fire water pump at Building 901-Z due to normal wear and tear. Gaskets and packing material to be handled as potential a…
C. E. Bourne Subcontractor 00000611 will provide assembly and disassembly roof repairs at Building 105-L.…
Repaint and black out sections of parking lot.…
Perform repairs to Building 719-5N.…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. The approximate width of the riprap addition i…