702-A Water Intrusion Recovery.…
The proposed activity involves repositioning of copper service lines in 773-A C-143/147 (RBA).…
This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
707-F Patch sheetrock/repaint rooms 6 and 8.…
The obsolete recloser on B Feeder is reaching the end of its life cycle and need to be replaced…
Modifications to receptacles and panels in Building 702-A.…
904-43G Pressure wash/touch up paint Hooterville Fill Station. Safety yellow areas have faded due to normal wear and exposure to weather…
Install voice only drop in Building 766-H.…
Repair and replace windows at Building 725-N.…
719-5N Prep/replace flooring.…