Overhaul pump EFP #1 at 902-5B.…
Remove receptacles and non-load bearing wall between Rooms10 &11 in Building 773-63A.…
Remove and reinstall insulation from Service Water (SW) Pump 003 so that check valve can be replaced.…
Main Feeder Utility Pole Treatment requiring soil disturbances within the B, D, L, K, and General Technical Areas. …
Painting interior of 701-1L…
Replace failed flow transmitter for RWM-02 Recovering Well located in A/M Areas. …
The subcontractor shall supply all labor, materials, pesticides, transportation and supervision necessary to perform bimonthly industrial pest cont…
Subcontractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform a Differential Global Positioning…
The subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …
Bonneville Power Administration (BPA) proposes to fund on-going inspection and maintenance activities for buildings and support infrastructure that…