Replacement of tile, carpet and sheet rock due to water damage / mold growth from water leak in heater room in 704-C…
This proposed activity will remove wallpaper, paint walls, and remove carpet from Building 703-H.…
Perform excavation activities and install additional cathodic protection around the fuel tank to support testing at 715-F Fuel Station.…
GSA has a contract with Iron Bow Technologies to provide and install a Cisco Unified Communication system to replace NETL's telephone systems and c…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace wood H-frame structures 24/3, 24/5, 33/4, and 38/1 along…
Modify Module Stripper GB3000 in Room 120 of Bldg 264-H to provide removable panels in the glovebox shell to enhance maintenance of the blowers wit…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
The Purge Water Disposal Station (PWDS) discharge piping has become clogged with suspected well development fluids suspected of containing portland…
Repair Entry Door #206 and 207 at 292-2F Fan Room.…
Replace Valve F1-905102-WW-V-016 at 905-102F Process Deepwell.…