Correct/recoat phosphate chemical dike at 782-3A.…
Perform cleaning, seal coating, and restriping of 717-K NW Parking Lot.…
The Bonneville Power Administration (BPA) is proposing to remedy three impairments along the Grand Ronde-Boyer transmission line located in Polk Co…
Bonneville Power Administration (BPA) is proposing to improve access roads along the Alston-Driscoll No. 2 Transmission Line. The proposed project …
Install metal/cork strips around Room 76 in Building 707-F.…
McQuay Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for relea…
Bonneville Power Administration (BPA) is proposing to remedy six impairments to the Keeler-Forest Grove No. 2 transmission line in six separate loc…
Evaluate and repair crane solenoid and breaker that is intermittently tripping on low lift crane at 681-3G.…
Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to re…
Install sidewalk and replace damaged stairs at Building 226-2F.…