Replace No. 002 Cooling Water Return Pump/Motor located at 281-2H…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500 to replace GB recirculation blower motors with new 15 hp motor design and re…
Kitchenette enhancements to be done in 704-K Room 14.…
Reroute condensation drainpipe from Air Handling Unit (AHU) catch pan on the second level of 713-1N (northwest corner).…
704-N Remove wall between rooms 12A and 12B.…
CX-022752: Miracle Mile-Snowy Range No. 1 115-kV Transmission Line Vegetation Management (Hand Work)
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Miracle Mile-Sno…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Miracle Mile-Sno…
This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…