The attached Scope of Work provides details for the replacement of PIV 2070, which will be replaced with PIV 2230.…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is NOT required.…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required.…
Housekeeping the 105-C Stack Area.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
Installation of flow restricting orifices on flammable gas cylinder installations throughout 773-A Section C.…
This DCF provides the design for the following functions: (1) Isolating Mass Spec 20 from Mass Spec 22 by blanking the interconnect manifold to all…
Janitor's closet enhancements to be done in 704-K.…
Subcontractor will provide roof repairs at 770-A with addition of Hydro-Stop coating.…
Western Area Power Administration (WAPA) proposes to conduct “danger tree” management along its Flatiron-Pole Hill (F-PH) 115-kV, and Estes-Pole Hi…