Replace the existing Carbon Steel Nitrogen Exhaust Line for the SAS glovebox with Stainless Steel Piping and remove the old Dewar manifold.…
BPA proposes to fund the Colville Confederated Tribes to perform ongoing routine operations and maintenance on its wildlife management areas/mitiga…
Site construction will prep and paint the curbs and traffic stripping around the exterior of 735-4B.…
This EEC covers various general renovations for buildings 725-N, 725-1N, and 725-2N in Central Shops. This revision includes the installation of ad…
Demo/removal of the windows/panels on the east wall of Building 83 at the NETL Pittsburgh Site and the replacement of these windows/panels with a c…
The most schedule and cost effective solution for INL's future mission is to convert operation and management of existing telecommunication transpo…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
BPA proposes to remove a tree that has fallen on the 13.8-kilovolt double-circuit Big Cliff-Detroit PH 1-2 No. 1 and No. 2 transmission lines betwe…
BPA proposes to replace 12 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.…
This ECP covers the Laboratory Directed Research and Development (LDRD) project which started in FY-18 and will continue into FY-21.…