Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms…
The scope of the Radioactive Materials Laboratory (RML) Ventilation System Replacement Project is to replace all the filter housings and ductwork curr
The Bonneville Power Administration (BPA) proposes to replace 2 wood pole transmission structures along the South Tacoma-Southwest No. 1 230-kV tra…
The contractor shall furnish of labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to pe…
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from approximate…
NEPA action levels for planned changes as defined in the Internal Procedure (IP00l)- How to Comply with the National Environmental Policy Act (NEPA…
The subcontractor shall provide all transportation, test/repair equipment, labor and technical supervision to perform on-site testing, inspection, …
Subcontractor will provide roof repairs at 773-63A. The Subcontractor “will not” disturb the existing roof while performing these repairs on 773-63…
Replace floor tile in building 713-1N, Section A1, Corridor 2 hallway between offices N321 and N204.…
Prepare gravel parking lot and laydown area north of Construction trailers in K-Area.…