Replace the existing fluorescent light fixtures with LED fixtures in Building 719-H.…
The Western Area Power Administration (WAPA), Sierra Nevada Region (SNR), is proposing to remove up to 421 hazard trees within and adjacent to the …
The existing No. 3 water heater unit and boiler at 735-1B is leaking and has failed due to normal wear and age.…
Replace 20,000 sq. ft. of carpet in the common areas and replacement of carpet for 17 offices in Building 707-C.…
This EEC covers routine maintenance, troubleshooting activities, and repairs resulting from troubleshooting activities conducted on underground sto…
The proposed action is to remove and replace existing roofing systems on Building 221-F Truckwell.…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 15/1, 15/5, 15/6, and 16/4, on its Lo…
The Mission Support Contractor (MSC) and its subcontractors perform routine maintenance activities and custodial services for buildings, structures…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), conducted emergency structure replacement of Structures 35/4, 35/5, 35/6 and …