Repaint grey and yellow areas at the 772-F Sample Tunnel Lift.…
Renovate exterior of wall of Room 332 in Building 730-4B to include wallpaper removal, painting, and vinyl lettering.…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Ault – Craig (AU-…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 0/5 and 5/7 on its Flatiron to Dixon …
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Subcontractor will provide roof repairs at Building 703-10B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perf…
The purpose of this revision is to address snow removal, specifically using a grader (patrol), on the road that connects the Obsidian Test Pad to t…