Preparing, patching, and repainting all exterior surfaces of the six-story tower.…
Remove the end of life asphalt roof shingles, overlay existing wood deck with 0.5" plywood, and install new 35 year asphalt shingles.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct "danger tree" management along its Boyd-Airport (BYD-ARP…
Award Number: DE-AC36-08GO28308, CX(s) Applied: B1.3, B1.15, NREL, Location(s): CO, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
Bonneville Power Administration (BPA) proposes to remove and replace marker balls on nine transmission lines in Oregon, Washington, Idaho, and Mont…
The roof at EBR-1 sections 2, 3, 4 and the guard house (figure 1) have reached the end of their useful life. Preventative maintenance is required t…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Road 4 (2.8 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …