LM is proposing to conduct a pilot study on the low-permeability rock-armored earthen cover of the disposal cell at the LMGrand Junction, Colorado,…
The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project willinclude the removal of sediment that has accumulated directly upstr…
This proposed activity will replace damaged floor tile in the HB Line Facility.…
BPA proposes to replace a steel access gate along the Olympia-Grand Coulee No. 1 287-kV transmission line. …
BPA proposes to repair the existing sliding garage door of the untanking tower building at the Covington Maintenance Headquarters. …
Replace carpet in 730-4B…
BPA proposes to pave the existing entry road and parking lot of the Schultz Maintenance Headquarters.…
CX-021317: Blue Ridge Communication Site Access Road Maintenance Grand and Summit Counties, Colorado
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road maintenance on existing roads used t…
Change Out Lockers in plus 15 K-Area Women's Locker Room…
Several offices and spaces will be remodeled to move people from B2 and B3.…