Construction personnel will seal asbestos insulation on the duct located in the closet of Room 125 - Building 704-H.…
Inspection and treatment of wood 13.8kva Feeder power poles in L-Area.…
Install Universal Wiring, UW, in Building 730-1B.…
Overhaul of Shone Ejector number 2 located at 607-2A.…
The Forest Service will prepare a design for and complete necessary repairs to the approach to Bridge No. 603-41G.…
Repair and replace ledger board, drip edge and gutters on 292-2F and 294-2F.…
Replace steps and decking at 235-11F.…
703-23B Repaint Centerra dog kennels.…
Inspection and treatment of utility and power poles in the F-Area.…
Relocate DI, Deionized, Water Supply 284-H…