This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
Install additional recepticals and replace flooring in 730-A Rm167.…
HVAC Chiller No. 1 and No. 3 cooling water vent valves are to be replaced with lighter ones and pipe hangers are to be reinforced.…
Paint Fire Hydrants and PIV's in F-Area.…
709-1G, Replace tile and wallboard in ladies shower.…
Subcontractor will provide roof repairs at Building 263-170H (Tritium Warehouse).…
Subcontractor will provide roof repairs at 233-24H.…
This is a painting job to repair some fixed contamination on 281-1H Delay Basin where there is peeling.…
Remove, replace, and paint base board wall cove base in K-Area Reactor Building (105-K) Personnel Wing.…
Utilization of aerial drone to apply herbicide to the roofs of 105-P and 105-R as part of normal post-closure maintenance.…