The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Remove insulation on caustic line to identify and repair caustic leak.…
Make emergency repairs on the Strategic Petroleum Reserve (SPR) system site piping, offsite pipelines, or other designated systems.
Replace 218-1H Overhead Door with Roll-Up Door.…
This modification will replace the existing 234-H FACP with the manufacturer’s suggested replacement panel that will provide compatibility with all…
The DCF outlines some caustic delivery improvements to 221-H through piping modifications and repurposing.…
To prevent water intrusion into the 105-K Building at the North Side Handball Court area, prep and apply Blue Max sealant in roof plugs area.…
Clean and repaint walls in 701-1K.…
Repair Building 264-2H roof.…
Perform inspection and repair of the Concrete CHEX plenums running North-South under B and C-005 prior to implementation of DSA Rev 2.…