Remove suspect asbestos material from metal 291-H Breech House and concrete stack joint.…
Repair, prep, and paint interior walls at 704-N.…
The Shielding Blocks are being removed from the Saltstone Facility Process Room.…
Like for like replacement of two A-wing Sump pumps and associated controls and supports.…
Replace the 105-L Chiller Unit and system waster pump per MT-LCR-2021-00002.…
For reliability and to minimize cost, the existing MG sets will be replaced by two new solid-state battery chargers.…
This Tritium facility modification project is being initiated to procure and install a new vault door as a replacement for the current door set in …
We are removing the valve and thus converting the fire suppression system in Room 54 to a permanently "wet" system.…
The scope is to design and replace the IML AHU system with equivalent equipment that is more reliable and maintainable.…
The purpose of this modification is to provide for the design, fabrication, and installation of new extraction equipment stands and cask trolley to…