The secondary containment concrete dike for the used oil tank at 784-A needs to be pumped out.…
BPA proposes to conduct activities, listed below, to operate and maintain high voltage electrical substation and switch yards throughout the BPA se…
During October 2018, the manufacturer of the existing 234-H FACP provide a notification of End of Service Life.…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam, L-La…
BPA proposes to remove and replace marker balls on the Grizzly – Summer Lake No. 1 transmission line at the 86/5 transmission tower. …
CX-021840: Vernal-Hayden 138-kV Transmission Line Access Road Maintenance and Structure Replacements
WAPA, Rocky Mountain Region, proposes to replace structures on its Vernal-Hayden, VNL-HDN, 138-kV Transmission Line in Moffat and Routt Counties, C…
A subcontractor will remove sludge and or waste water from various sanitary waste water systems at SRS.…
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket and gasket-likemater…
Ongoing routine maintenance at the WVDP and associated facilities and systems.…
Removal of all existing HVAC air handling systems throughout the building and the installation of one new packaged air handling unit installed on g…