Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Sterling-Wild…
Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G).…
BPA proposes to replace 15 wood pole structures and associated structural/electrical components along several transmission lines.…
Idaho National Laboratory (INL) has a variety of highways and roads ranging from heavily used, paved State Highways to lightly used, unpaved two-tr…
Subcontractors will repair the roof on Building (Trailer) 221-24H…
Stream surveillance location FM-A7 is part of the routine monthly stream surveillance sampling program on Four Mile creek.…
The focus of the temporary modification is to keep the 232-H backup Exhaust Fan A (53.004-A) available in case of failure of Exhaust Fan B(53.005-A…
On-site testing, inspection, and calibration of the electrical equipment at the main site.…
Paint 12 wellheads at the brine disposal area, and blast and paint the prover piping.…
Excavate to correct the underground domestic water leak Southeast of 281-15H…