This EEC covers the removal of 3 inlet HEPA Filters and the respective housings that were used to support Cabinet 26 operations in F091.…
This EEC covers the removal of the inlet HEPA Filters and the respective housings that were used to support Cabinet 25 operations in F091.…
BPA proposes to replace the dead end tower insulators on both Chief Joseph-Snohomish No.3 and No. 4 transmission lines. …
BPA preposes to replace deteriorating wood pole structures and any associated hardware and guys in the Olympia TLM Maintenance District.…
The subcontractor, Queen City Railroad Construction, shall replace wooden line switch ties from the railroad bed, identified by site transportation…
Tritium Extraction Facility, TEF, Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
The project plans to add a turn lane as Taylor Blvd approaches the Service Road on the south side of the MFC parking lot. …
BPA proposes to replace the SPAR arm and replace or reinforce hardware on SPAR arms at transmission poles for fire mitigation.…
BPA proposes to fund Washington Department of Fish and Wildlife operations and maintenance at six wetland enhancement sites. …
SWPA proposes to construct a new non-guyed tower, radio/generator buildings, and construct paved and gravel roads to the tower facility from Maynar…